Bay Area Habitat for Humanity - Houston, Inc.

Construction Schedule

Home | Photo Gallery | Video Gallery | FAQ: Frequently Asked Questions | Construction Schedule | Volunteer Form | Recent New Home Owners | Donations and Funding | Contact Us | Board of Directors | Press | BAHFH.ORG PowerPoint Presentation | Time Card

Please Check the 7-Day Weather Forecast.

Click Here to check the 7 Day Weather Forecast. If the weather is bad (ex: RAIN) they will usually cancel worksite construction for that day.

NoSandals.JPG

NO Open Toed Shoes
NO Sandals
NO Flip-Flops

We are currently scheduled to work every Thursday and Saturday,  8 am - 2 pm unless otherwise posted or the weather gets bad.  Saturday is when large groups come out.  Thursday is usually the Thursday group of regular retirees.

Even if you are not part of a group, you can show up and sign-in to work, watch, or just ask questions.

BAHFH Spring Build 2008 Volunteer Group Roster














































Group

1/5

1/12

1/19

1/26

2/2

2/9

2/16

2/23

3/1

3/8

3/15

3/29

4/5

4/12

4/19

4/26

5/3

5/10

5/17

5/31

6/7

6/14

6/21

6/28

Bay Area Presbyterian





X








X








X




Christus Victor Lutheran









X








X







X

Church at the Springs








X








X









Clear Creek Community











X








X





X

Clear Lake Baptist






X








X








X



Clear Lake Presbyterian








X








X









Clear Lake Methodist







X





X








X





First Methodist Dickinson











X






X


X






Gloria Dei Lutheran















X










Grace Comm. Church/ Venue















X










House of Prayer Lutheran






X








X








X



Notre Dame Alumni Houston

















X








St. Bernadette









X









X





X


St. Christopher Episcopal






X








X








X



St. Clare









X









X





X


St. Paul


















X





X


St. Thomas Episcopal













X








X




UH College of Pharmacy

X

X

X

X





















Webster Presbyterian





X








X








X




Wylie Labs










X








































X

= Group is providing lunch for the entire worksite volunteers.














(Plan for about 35, but do a real time head count in the morning.)









030108-68.JPG
3003 Ohio on Sat. March 1, 2008

3003 Tasks

Site Foreman

Date

Day

Volunteer Organization

Chalk Slab

completed

1/31/2008

Thursday

Thursday Group

Mark Sole/Top Plate

completed




Build Corner Posts/Pockets

completed




Build Window/Door Frames

completed




Build Beams





Level fill

50% completed



****************************





Build Exterior Walls

completed

2/2/2008

Saturday

Build Interior Walls

completed




Put On Top Plate

completed




Put Up Beams

completed




****************************





Catch up


2/7/2008

Thursday

Thursday Group

Engineering Inspection





****************************





Frame Porch

completed

2/9/2008

Saturday

Joists

completed




Ridge Beam

completed




Rafters

completed




Wall Hurricane Clips





****************************





Catch up


2/14/2008

Thursday

Thursday Group

Engineering Inspection





Pour





(Driveway/Walk/AC Pad)





****************************





Gable Ends

completed

2/16/2008

Saturday

Soffits/Fascia

completed




Deck Roof

completed




Paper Roof

completed




Sheath Sides

completed




Strong Backs

completed




Finish Windstorm Clips




****************************





Catch up


2/21/2008

Thursday

Thursday Group

Engineering Inspection





****************************





Roof/Side

50% completed

2/23/2008

Saturday

Catch up





****************************





Catch up


2/28/2008

Thursday

Thursday Group

Engineering Inspection





****************************





Roofing

50% completed

3/1/2008

Saturday

Attic AC Deck

completed




Attic HW Deck

completed




Hidden Stair

completed




Dead Wood

completed




Cabinet Nailers





Plumbing Rough In

90% completed



****************************





Catch up


3/6/2008

Thursday

Thursday Group

Engineering Inspection





****************************





Finish Roofing


3/8/2008

Saturday

Cont. Plumbing Rough In




Install Windows

90% completed



Install Exterior Doors

completed




Exterior Locks





Blue Board





Porch Ceiling





Trim Porch





Vinyl Siding

50% completed



****************************





Catch up


3/13/2008

Thursday

Thursday Group

Engineering Inspection





****************************





AC Rough In


3/15/2008

Saturday

Finish Plumbing Rough In




Electrical Rough In





Exterior Trim





Vinyl Siding





****************************





Plumbing Inspection





****************************





Insulation





****************************





Sheet Rock





****************************





Thursday off


3/20/2008

Thursday

Thursday Group Off

****************************





Weekend off


3/23/2008

Saturday

Weekend off

****************************





Catch up


3/27/2008

Thursday

Thursday Group

Driveway/Walk/AC Pad





Engineering Inspection




****************************





Prime/Paint Base Boards/Sills

3/29/2008

Saturday

Sewer Connections





Exterior Trim - Finish





Vinyl Siding - Finish





****************************





Catch up


4/3/2008

Thursday

Thursday Group

****************************





Vinyl Siding - Finish


4/5/2008

Saturday

Paint Interior - Prime Coat




Paint Interior Doors





Window Sills -Paint





Paint Exterior Doors - 1st




****************************





Catch up


4/10/2008

Thursday

Thursday Group

****************************





Install Interior Doors


4/12/2008

Saturday

Install Base Boards/Sills




Paint Exterior Doors - 2nd




Paint Interior - 2nd Coat




****************************





Grass


4/17/2008

Thursday

Thursday Group

Catch up





****************************





Electrical Trim Out


4/19/2008

Saturday

Cabinets





Counter Tops





Plumbing Trim Out





****************************





Electrical Connect





Catch up


4/24/2008

Thursday

Thursday Group

****************************





Interior Trim Out


4/26/2008

Saturday

Exterior Trim Out





Site Clean Up





****************************





Catch up


5/1/2008

Thursday

Thursday Group

****************************





Vinyl


5/3/2008

Saturday

Carpeting





Plumbing Inspection





Final Engineering Inspection




****************************





Stove


5/8/2008

Thursday

Thursday Group

Punch Out





****************************





DEDICATION


5/10/2008

Saturday

030108-68.JPG
3005 Ohio on Sat. March 1, 2008

3005 Tasks

Site Foreman

Date

Day

Volunteer Organization

Chalk Slab

completed

1/31/2008

Thursday

Thursday Group

Mark Sole/Top Plate

completed




Build Corner Posts/Pockets

completed




Build Window/Door Frames

completed




Build Beams

completed




Level fill

completed




****************************





Build Exterior Walls